A structured, no-nonsense workbook for finding and fixing the website security gaps that actually matter — SSL/TLS, security headers, authentication, WordPress and Laravel configuration, backups, monitoring, and more. Built by the team behind Red Secure Tech's penetration testing engagements.
Instant download. No subscription. Use it today, re-run it every quarter.
The Website Security Audit Checklist is a structured self-review workbook covering 150+ individual security checks across 25 review areas — asset inventory, SSL/TLS, security headers, authentication, access control, CMS/platform hardening, server & database security, backups, and monitoring. It is not a penetration test; it's the tool you use before deciding whether you need one. Editions start at €29.
Every edition is built around the same core toolkit — a scorecard, a risk register, and an action plan — so a pile of checkmarks turns into a prioritized to-do list, not just a longer list.
Every check rolls up into a single 0–100 score with a clear rating — Strong, Good, Needs Improvement, High Risk, or Critical — so you can track posture over time.
Every failed check becomes a tracked finding — severity, evidence, recommendation, owner, and deadline — so nothing falls through the cracks.
The Excel/Sheets edition scores itself — mark Pass/Fail/N/A and the dashboard, per-section breakdown, and executive summary update live.
All editions cover the same 150+ checks. The difference is depth, format, and what you do with it.
The full 150+ check toolkit in a fast, 39-page read.
The flagship 70-page edition — every section, fully explained.
Excel / Google Sheets — fill it in and watch it score itself.
Essentials + Complete Workbook + Editable Workbook — every format, one price.
| Feature | Essentials €29 |
Complete Workbook €59 |
Editable Workbook €39 |
|---|---|---|---|
| 150+ checks, 25 review areas | ✓ | ✓ | ✓ |
| Format | .xlsx | ||
| Pages / structure | 39 pages | 70 pages | 6 tabs |
| Scorecard | ✓ | ✓ | ✓ (auto-calculated) |
| Risk register | ✓ | ✓ | ✓ |
| Executive summary | ✓ | ✓ | ✓ (live formulas) |
| 30-day action plan | ✓ | ✓ | ✓ |
| Full-page section dividers | — | ✓ | — |
| Detailed security header guidance | Compact | Full breakdown | Compact |
| Glossary | 18 terms | 30 terms | — |
| Master checklist index | — | ✓ | — |
| Auto-scoring / dropdowns | — | — | ✓ |
It's a structured checklist workbook with 150+ individual security checks across 25 review areas — including SSL/TLS, security headers, authentication, WordPress and Laravel configuration, backups, and monitoring. It's designed to help website owners, developers, and agencies find and prioritize security gaps without needing specialist tooling.
No. The checklist is a structured self-review tool, not a penetration test. It helps you catch common configuration mistakes and missing controls, but it doesn't replace active testing by a security professional. Red Secure Tech offers professional penetration testing and vulnerability assessments separately for sites that need that level of assurance.
Both cover the same 150+ checks across all 25 review areas. The Complete Workbook (70 pages) adds a full-page divider for every section, a detailed breakdown of each security header, a glossary of 30 terms, and a master checklist index. The Essentials edition (39 pages) covers the same checks and toolkit — scorecard, risk register, executive summary, 30-day plan — in a faster, more compact read.
Yes. Section 12 is dedicated to CMS security and includes a 19-item WordPress-specific checklist (core, plugin and theme updates, XML-RPC, REST API exposure, wp-config.php protection, and more) alongside a 14-item Laravel-specific checklist.
The Essentials, Complete Workbook, and Editable Workbook editions are licensed for your own use. Agencies and consultants who need to run this checklist across multiple client sites, with white-label branding and a multi-client tracker, should use the Agency Edition.
The Essentials and Complete Workbook editions are delivered as PDF. The Editable Workbook is delivered as an .xlsx file compatible with Excel and Google Sheets, with dropdowns, conditional formatting, and an auto-calculating dashboard.
150+ checks. 25 review areas. One repeatable process. Start today.
See Pricing & Buy© 2016 – 2026 Red Secure Tech Ltd. Registered in England and Wales — Company No: 15581067